London's Trusted Party Wall Surveyors
London's Highly Trusted Party Wall Surveyors, helping you navigate the Party Wall etc. Act with confidence and ease.
"Navigating the Party Wall Act doesn't have to be a headache — we're here to make it straightforward and stress-free."
Whether you're carrying out works or your neighbour is — we're here for you.
Comprehensive party wall services tailored to your needs, delivered with expertise and transparency.
Comprehensive review of proposed building works to establish party wall obligations and advise on the correct course of action.
Learn More →Appointed to act on your behalf under the Act — for Building Owners, Adjoining Owners, or as the Agreed Surveyor.
Learn More →Detailed photographic and written records of adjoining properties before works begin, protecting all parties against future claims.
Learn More →We're proud to work alongside leading developers, housing associations, and construction companies across London.




















A selection of projects we've worked on across London and the South East.

Shakespeare Hotel, Stratford

Longley Road, Tooting

The Grove, Coulsdon

Box Ridge Avenue, Purley

Bellingham Mews, Catford

White Post Street, Peckham

Wimbledon Park Road

Greesham Gardens, Hampstead

Wayneflete Tower, Esher

Ormund Gate, Chelsea

Shakespeare Hotel, Stratford

Longley Road, Tooting

The Grove, Coulsdon

Box Ridge Avenue, Purley

Bellingham Mews, Catford

White Post Street, Peckham

Wimbledon Park Road

Greesham Gardens, Hampstead

Wayneflete Tower, Esher

Ormund Gate, Chelsea
Based in Wimbledon · SW19
We're based in Wimbledon — famously home to The Championships and the All England Lawn Tennis Club — and we've got London and the surrounding areas covered.
"Need answers? Chat with us — our advice is free and friendly."
We're here to help with free, impartial advice. Call us now on 020 8545 2680 / 077 2828 2727 or click below to request a quote.
Request Your Free QuoteAbout Us
Party Wall Specialists are a team of experienced, FPWS-qualified party wall surveyors serving all 33 London boroughs and surrounding areas. We provide expert guidance on all matters relating to the Party Wall etc. Act 1996.
Our mission is simple: to make the party wall process as straightforward and stress-free as possible.
Whether you're a building owner planning works, an adjoining owner who has received a notice, or a developer managing multiple projects, we deliver fast, ethical, and transparent service at competitive fixed fees.
Explore who we are in more detail.
The principles that guide everything we do — from free advice to transparent fixed fees.
Learn More →A full range of party wall services for building owners, adjoining owners, and developers.
Learn More →Local party wall surveyors working across all 33 London boroughs and surrounding areas.
Learn More →Trusted by leading organisations, architects and developers across Greater London's property and design sector.







Call us today or fill out our contact form for free, no-obligation guidance.
Contact UsThe principles that guide everything we do.
At Party Wall Specialists, our values aren't a marketing exercise — they're how we run every project. From the first phone call to the final award, these are the principles we hold ourselves to.
Independent guidance at no cost, before you commit. We'd rather give you ten minutes of honest advice than win a project that isn't right for you.
Fixed fees agreed upfront, no hidden extras, and plain-English explanations of every step. You'll always know what you're paying for and why.
We keep you updated at every stage — from notice to award. Calls returned the same day, emails answered promptly, and no client left wondering what's happening.
Local surveyors who genuinely care about your project. Party wall matters often involve neighbours — we work hard to protect properties and preserve relationships.
Practical strategies to save you money without cutting corners. We'll always tell you when notices aren't needed — and when a simpler approach will do the job.
Free, no-obligation party wall advice from a team that puts ethics first.
Get Free AdviceA summary of our core services — from first review to final award.
We handle every stage of the Party Wall etc. Act 1996 — whichever side of the wall you’re on. For full details, see our How We Help section.
Every party wall project follows the same key stages.
We also provide free tools to help you understand and navigate the process.
Free blank templates for all notice types — download, preview, or print.
Our guided wizard drafts your notice automatically from your project details.
Formally appoint your surveyor online — fill, sign, and submit.
Quick quiz to check if the Act applies to your works.
Answers to the questions we hear most often, written in plain English.
Every party wall term explained — 35+ definitions in plain English.
Tell us about your project and we'll point you in the right direction — for free.
Get Free AdviceLocal party wall surveyors working across all 33 London boroughs and surrounding areas.
We are based in Wimbledon and serve every London borough. Local knowledge matters in party wall work — from the typical construction of Victorian terraces in Hackney to the basement extensions of Kensington — and we know London property inside out.
Click any borough below to see how we work in your area.
Tap a borough for area-specific information.
While we are based in Wimbledon and cover all 33 London boroughs, we also regularly work in the surrounding counties. If your project is just outside Greater London, we can still help.
Not sure if we cover your area? Give us a call — we're always happy to discuss your project regardless of location.
Wherever you are, the process follows the same five stages.
Free, friendly party wall advice — across London and the surrounding areas.
Get Free AdviceOur Services
We guide you through every stage of the Party Wall process — and provide free tools most firms don’t.
Before any notices are served, we carry out a thorough review of your proposed building works to determine whether the Party Wall etc. Act 1996 applies and what obligations you may have.
We examine your architectural and structural drawings, identify every notifiable element, and advise on the correct notices, timescales, and next steps. This initial review is always free.
Every statutory right under the Party Wall etc. Act 1996 — from raising a party wall to excavating near a neighbour’s foundations. Common project types include:
Under Section 10 of the Act, when a dispute arises, surveyors must be appointed. We act impartially in three capacities:
Appointed by the building owner to guide them through the process.
Learn More →Safeguards the neighbour’s property — at the building owner’s expense.
Learn More →MFPWS, MPTS, and ACABE accredited. Professional Indemnity Insurance: £5 million.
Choosing a SurveyorFor Building Owners, your surveyor prepares and serves valid notices on all affected adjoining owners. For Adjoining Owners, we review any notices you’ve received and advise on your options.
Section 1
1 month notice
Section 3
2 months notice
Section 6
1 month notice
A detailed photographic and written record of the adjoining property before works begin. Undertaken where requested by the Adjoining Owner or where surveyors have been appointed.
The Schedule protects both parties: the Building Owner has evidence that pre-existing defects were not their fault, and the Adjoining Owner has proof of their property’s condition before works started.
Learn MoreThe legally binding document, prepared and served where surveyors have been appointed and a dispute has arisen. The Award sets out how and when works may proceed, working hours, access arrangements, protective measures, and provisions for making good any damage.
Enforceable through the County Court. Either party can appeal within 14 days.
About AwardsIf you’re a Building Owner planning works, we’ve prepared a plain-English guide covering the full process, your responsibilities, timescales, and our transparent fixed fees — so you can budget with confidence.
Everything from serving notices to receiving the final Award — explained step by step.
Fees & ProcessIf you’re an Adjoining Owner who has received a party wall notice, we explain your options, the process, and what it costs you — which is usually nothing.
The building owner is responsible for all reasonable surveyor fees under the Act.
Your OptionsUnlike most firms, we provide free online tools so you can understand the process, check your obligations, and even draft your own notices before you instruct anyone.
Call us today or fill out our contact form for free, no-obligation guidance.
Contact UsBefore any party wall notices are served, it is essential to establish whether the proposed building works fall within the scope of the Party Wall etc. Act 1996. A Project Review is a detailed assessment of your architectural plans and drawings carried out by one of our qualified surveyors. We identify every element of the proposed works that may trigger obligations under the Act.
Click on any work type to learn more about how the Party Wall Act applies:
Constructing new walls or buildings along or astride the boundary line.
One of the most popular home improvements in London.
Inserting steel beams, raising party walls, and roof space alterations.
Notifiable work affecting the party wall structure.
Complex, high-risk projects involving deep excavations.
Strengthening or lowering existing foundations.
A written report setting out which notices are required, who they must be served on, relevant notice periods, and recommended next steps. Our initial consultation is always free.
All statutory rights, notice types, and which projects trigger them — in one filterable reference.
When you construct a new wall or building along the boundary between your property and a neighbour’s, the Party Wall etc. Act 1996 is almost certainly engaged. This applies whether you’re building a new house on a cleared plot, replacing a demolished property, constructing a wall astride the boundary, or simply building wholly on your own land up to the line.
New-build projects often combine several notifications — a Line of Junction notice for the new wall, and an Adjacent Excavation notice for the foundations. Getting these served together, correctly, and in the right order is the difference between a clean start on site and a stalled project.
Most new-build projects engage two sections, and sometimes three:
Section 1 and Section 6 require one month’s notice; Section 3 requires two months’. Where multiple notices apply, the longest notice period governs your start date.
As the Building Owner, you’re responsible for all reasonable fees. Where your neighbour consents, our fixed fees are:
If your neighbour dissents and a Party Wall Surveyor is appointed (Option 2 · Agreed Surveyor or Option 3 · Separate Surveyors), fees depend on the complexity of the project — please contact us for a fee estimate. As the Adjoining Owner, your cost is £0 — the Act makes the Building Owner responsible for all reasonable fees.
For a single adjoining owner, assuming no complications:
Starting earlier. Works can begin before the notice period expires if the adjoining owner gives written consent to an earlier start. This is common where neighbours are cooperative and the paperwork is in order.
A notice landing on the doormat with no warning is the single biggest source of neighbour friction we see. Before you serve:
Planning a new build? Get a free project review — we’ll tell you exactly which notices you need before you spend anything.
Almost always. New builds typically trigger Section 1 (new walls on or at the boundary) and Section 6 (excavation for foundations), and sometimes Section 2 if an existing party wall is involved. Notices must be served on every adjoining owner.
Section 1 still applies when building on or near the line of junction. If the new wall is astride the boundary, s.1(2) requires the adjoining owner’s consent. If they refuse, you must build wholly on your own land under s.1(5).
s.1(2) — new wall astride the boundary. Requires the neighbour’s written consent. s.1(5) — new wall wholly on your own land, up to the boundary. Consent not required, but 1 month’s notice is.
At least two months before works start, to allow for the notice period, the 14-day response window, and time to appoint surveyors if dissent arises. Section 3 works, if involved, push this to three months.
Not without their consent. Building off existing foundations or projecting footings under their land requires either Section 1(2) astride consent or a separate arrangement — the Party Wall Surveyor will address this in the Award if dissent arises.
Each adjoining owner is served separately. If one consents and one dissents, you’ll have an Award with the dissenting neighbour and no Award with the consenting one. Both processes run in parallel.
Rear and side extensions are the most popular home improvement in London — and the most common reason we’re asked to serve notices. Almost any ground-floor extension on a terraced or semi-detached property will engage the Party Wall etc. Act 1996 in at least one way, and often several.
The trigger is usually the foundations rather than the walls above. Even if your extension stands clear of the party wall, excavation within 3 metres of a neighbour’s building is almost always notifiable under Section 6. Miss that, and you can find yourself trying to obtain retrospective consent after works have started — a much more difficult and expensive position.
Most rear and side extension projects engage two sections, and sometimes three:
Section 1 and Section 6 require one month’s notice; Section 3 requires two months’. Where multiple notices apply, the longest notice period governs your start date.
As the Building Owner, you’re responsible for all reasonable fees. Where your neighbour consents, our fixed fees are:
If your neighbour dissents and a Party Wall Surveyor is appointed (Option 2 · Agreed Surveyor or Option 3 · Separate Surveyors), fees depend on the complexity of the project — please contact us for a fee estimate. As the Adjoining Owner, your cost is £0 — the Act makes the Building Owner responsible for all reasonable fees.
For a single adjoining owner, assuming no complications:
Starting earlier. Works can begin before the notice period expires if the adjoining owner gives written consent to an earlier start. This is common where neighbours are cooperative and the paperwork is in order.
A notice landing on the doormat with no warning is the single biggest source of neighbour friction we see. Before you serve:
Planning a rear or side extension? Get a free project review — we’ll tell you exactly which notices you need before you spend anything.
Almost always. Most rear extensions involve excavation within 3 metres of a neighbouring building (Section 6). A professional review of your plans will confirm which notices are needed and when.
The party wall itself may be clear — but Section 6 catches foundations within 3 metres of the neighbour’s building (or 6 metres, depending on depth). The depth and distance from the boundary are what matter, not whether the walls above touch.
No — you must wait the full notice period (1 month for Section 6, 2 months for Section 3) unless the adjoining owner gives written consent to an earlier start.
Section 6(1) applies to excavation within 3 metres that goes below the level of the neighbour’s foundations. Section 6(2) applies to excavation within 6 metres where an imaginary 45° line from the base of their foundations would be cut. Most rear extensions fall under 6(1); deep basements or piled foundations often trigger 6(2).
Usually yes, though they’re often served together. A Section 6 notice covers excavation; a Section 3 notice covers works to the party wall itself (flashing, beams, etc.); a Section 1 notice covers new walls on the line of junction. Serving them together is common practice.
Two to three months before works start. One month is the statutory notice for Section 6, plus 14 days for the response period, plus time to appoint surveyors and agree an Award if dissent arises. If your builder is ready next month, you’re tight.
Loft conversions are one of the most common reasons we’re instructed in London. Almost every loft conversion in a terraced or semi-detached house touches the party wall in some way — whether it’s cutting in steels, raising the flank wall, or weathering a new roof into the neighbour’s. All of these are notifiable under the Party Wall etc. Act 1996, and getting the paperwork right protects both you and your neighbour.
A loft conversion started without proper notice is one of the most common sources of disputes we’re called in to resolve — usually after works have already begun, which is exactly when it costs the most to fix.
The main section engaged is Section 2 — the list of works a building owner may carry out to an existing party wall. For a typical loft conversion, the relevant sub-sections are:
These are served by a Section 3 Party Structure Notice, which requires two months’ notice before works begin. If your conversion also involves excavation — for instance, underpinning to support a new staircase below — Section 6 may also apply, with its own one-month notice.
As the Building Owner, you’re responsible for all reasonable fees. Where your neighbour consents, our fixed fees are:
If your neighbour dissents and a Party Wall Surveyor is appointed (Option 2 · Agreed Surveyor or Option 3 · Separate Surveyors), fees depend on the complexity of the project — please contact us for a fee estimate. As the Adjoining Owner, your cost is £0 — the Act makes the Building Owner responsible for all reasonable fees.
For a single adjoining owner, assuming no complications:
Starting earlier. Works can begin before the two-month notice period expires if the adjoining owner gives written consent to an earlier start. This is common where neighbours are cooperative and the paperwork is in order.
For most loft conversions we handle, any Award is served well inside the two-month notice period — so the statutory clock, not the surveyor process, is usually the critical path.
A notice landing on the doormat with no warning is the single biggest source of neighbour friction we see. Before you serve:
Planning a loft conversion? Get a free project review — we’ll tell you exactly which notices you need before you spend anything.
Most loft conversions involve cutting steel beams into the party wall (s.2(2)(f)) and raising the party wall height (s.2(2)(a)). Both are notifiable under the Act, and a Section 3 Notice with 2 months’ notice is required.
Inserting lead flashing is covered by s.2(2)(j) and must be included in your Section 3 Notice. Don’t omit it — it’s a common defect in DIY notices, and Awards built on defective notices are vulnerable to challenge.
It’s not strictly mandatory, but strongly recommended. A Schedule of Condition records the adjoining owner’s property before works begin, protecting both sides if damage is later alleged. Most disputes we see could have been avoided by a proper SoC.
After 14 days without a written response, the Act treats the silence as a deemed dissent. Surveyors must then be appointed — an Agreed Surveyor with the neighbour’s consent, or two separate surveyors if not. We handle this on your behalf.
You can — but most we see are missing sub-sections, have the wrong owner’s name, or cite the wrong section. Our Notice Generator is designed specifically around the loft scenario and gets the sub-sections right.
Three to four months before works start. Two months is the statutory notice, plus two to four weeks to agree an Award if dissent arises. If your builder is ready next month, you’re already late.
Removing a chimney breast is one of the most frequently misunderstood party wall issues we encounter. The chimney breast almost always forms part of the party wall — even when it sits inside your house on your side of the plaster. Cutting it out is a notifiable work under the Party Wall etc. Act 1996, and the chimney stack that remains above the roof affects both properties.
Chimney breast removals are also the project type we’re most often called in to fix after the fact — where works have started, cracks have appeared on the neighbour’s side, and there’s no notice, no Award, and no Schedule of Condition to fall back on.
Chimney breast removals engage Section 2, specifically:
These are served by a Section 3 Party Structure Notice, requiring two months’ notice before works begin. A chimney breast removal does not normally trigger Section 6 (adjacent excavation) unless the works go below ground level.
As the Building Owner, you’re responsible for all reasonable fees. Where your neighbour consents, our fixed fees are:
If your neighbour dissents and a Party Wall Surveyor is appointed (Option 2 · Agreed Surveyor or Option 3 · Separate Surveyors), fees depend on the complexity of the project — please contact us for a fee estimate. As the Adjoining Owner, your cost is £0 — the Act makes the Building Owner responsible for all reasonable fees.
For a single adjoining owner, assuming no complications:
Starting earlier. Works can begin before the two-month notice period expires if the adjoining owner gives written consent to an earlier start. This is common for straightforward breast removals where the neighbour is cooperative and the method is agreed.
Chimney breast removals often create the cleanest disputes we see — cracks appearing on the neighbour’s side the day after works. Before you serve:
Removing a chimney breast? Get a free project review — we’ll tell you exactly which notices you need before you spend anything.
Yes — chimney breasts almost always form part of the party wall. Removing one engages s.2(2)(g) of the Act (cutting away a chimney breast, jamb or flue). A Section 3 Notice with 2 months’ notice is required.
If the stack serves the adjoining property’s flues, the Award will set out conditions for supporting and maintaining the shared stack. Structurally, the stack must remain stable after the breast below is removed — through-beams or gallows brackets are the usual solutions.
Yes — chimney breast removal affects structural stability. You need Building Control approval and Party Wall compliance. They’re separate processes and run in parallel.
That’s a structural engineering question, not a party wall one — but it often comes up. Gallows brackets suit smaller stacks; larger or tapered stacks usually need through-beams. Cutting through-beams into the party wall is notifiable under s.2(2)(f), so flag it in your notice.
Each side’s removal is separately notifiable. You still need to serve a Section 3 Notice, and the Award should address the current configuration of the shared stack and breast structure.
The works themselves are usually 3–7 days. The notice process is the same as any Section 3 matter: 2 months’ statutory notice, 14 days for the response window, 2–5 weeks to agree an Award if dissent arises. Plan for three months from notice to start.
Basement conversions are among the most technically complex and highest-risk projects covered by the Party Wall etc. Act 1996. They almost always involve underpinning the party wall, deep excavation close to neighbouring foundations, and prolonged works with significant vibration and ground movement. The risk of damage — and of disputes — is higher than any other project type we handle.
Because of the risks involved, basements are also the project type where the statutory process matters most. A proper Party Wall Award sets out method statements, sequencing, monitoring, and insurance arrangements that protect both sides. Trying to start a basement without the full paperwork in place is the fastest route we know to an injunction.
Basements typically engage multiple sections of the Act simultaneously:
Works under Section 2 are served by a Section 3 Notice requiring two months’ notice. Section 1 and Section 6 notices require one month. Multiple notices are usual, often served on more than one adjoining owner.
As the Building Owner, you’re responsible for all reasonable fees. Where your neighbour consents, our fixed fees are:
In practice, full consent is rare for basement projects — adjoining owners almost always appoint a surveyor to review the method statements and monitor the works. Where a Party Wall Surveyor is appointed (Option 2 · Agreed Surveyor or Option 3 · Separate Surveyors), fees depend on the depth, neighbours involved, and engineering complexity — please contact us for a fee estimate. As the Adjoining Owner, your cost is £0 — the Act makes the Building Owner responsible for all reasonable fees.
Basement timelines run longer than other project types because of the engineering review involved. For a single adjoining owner:
Starting earlier. Works can begin before the two-month notice period expires if the adjoining owner gives written consent — but for basements this is rare, because most neighbours want the Award in place first.
Multiple neighbours. Basements often involve two or three adjoining owners. Each has their own 14-day response window and, if dissenting, their own surveyor process — running in parallel. Start as early as you can.
Basements test neighbour relationships like no other project. Before you serve:
Planning a basement conversion? Get a free project review — we’ll tell you exactly which notices you need before you spend anything.
Basement work almost always involves underpinning the party wall (Section 2) and excavating below the foundations of adjoining properties (Section 6) and often affecting multiple neighbours at once. The engineering complexity, duration on site, and risk of subsidence are all higher than any other project type.
Possibly — if the excavation could affect their stability, the surveyors may require protective underpinning as part of the Award. The Building Owner pays, and it’s treated as part of the enabling works for the basement.
Longer than simpler projects. With an Agreed Surveyor, typically 4–6 weeks to Award. With separate surveyors, 6–10 weeks. Basements with multiple neighbours take longer as each process runs in parallel. Start as early in your design programme as possible.
Yes — always. The surveyors review method statements and monitor the process, but the engineering design sits with your structural engineer. Most Awards specifically require engineer-signed sequences and monitoring regimes.
The Building Owner pays all reasonable surveyor fees, including the adjoining owner’s surveyor. For basement projects these fees can be substantial because of the engineering review required — please contact us for a fee estimate.
Standard works insurance usually excludes basement underpinning — specific cover is needed. The Award will typically require evidence of appropriate insurance before works start, and may specify minimum limits.
Underpinning strengthens or lowers the foundations of an existing building. It comes up in three main contexts: as part of a basement conversion (extending the party wall downwards), as remedial work to address subsidence, and as enabling work for a deeper neighbouring excavation. In every case, underpinning a party wall is expressly notifiable under the Party Wall etc. Act 1996 — and it’s one of the highest-risk works the Act covers.
Getting the sequence wrong — underpinning too long a section, or failing to support the remaining wall — can cause rapid and severe settlement on the neighbour’s side. The Award process exists precisely to agree method, sequence, and monitoring before anyone puts a spade in the ground.
Underpinning engages two sections of the Act, almost always together:
Section 2 works are served by a Section 3 Notice, requiring two months’ notice. Section 6 requires one month. Both are typically served together.
Common underpinning methods — and all engage the Act:
As the Building Owner, you’re responsible for all reasonable fees. Where your neighbour consents, our fixed fees are:
In practice, full consent is uncommon for underpinning works — adjoining owners almost always appoint a surveyor to review the method statements and monitoring regime. Where a Party Wall Surveyor is appointed (Option 2 · Agreed Surveyor or Option 3 · Separate Surveyors), fees depend on the method, depth, and engineering review involved — please contact us for a fee estimate. As the Adjoining Owner, your cost is £0 — the Act makes the Building Owner responsible for all reasonable fees.
For a single adjoining owner, assuming no complications:
Starting earlier. Works can begin before the two-month notice period expires if the adjoining owner gives written consent — but for underpinning this is rare, because the method needs to be fully agreed before anyone wants to sign off the start.
Underpinning is invasive, long-duration, vibration-heavy work close to the neighbour’s foundations. Before you serve:
Planning underpinning works? Get a free project review — we’ll tell you exactly which notices you need before you spend anything.
Yes — underpinning a party wall is expressly notifiable under s.2(2)(a). A Section 3 Notice with 2 months’ notice is required. Section 6 typically applies too because of the depth of excavation involved.
The Building Owner pays for all works they propose, including underpinning. If the underpinning is needed to protect the adjoining property from the Building Owner’s works, it’s included in the Award at the Building Owner’s cost.
The Award will typically require detailed method statements from a structural engineer covering bay sequencing, bay width, depth, propping, dewatering (if needed), and monitoring regimes. These must be agreed before works begin.
Mass concrete (pin-by-pin) excavates in short bays beneath the existing foundation and casts concrete — cheaper, simpler, common for basements. Mini-piled uses small-diameter piles connected by a reinforced beam — used where mass concrete isn’t viable (poor ground, deep founding, space constraints).
The Act does have provisions for urgent safety works, but they’re narrow. In practice we always recommend serving notice even for emergency works wherever there’s time — retrospective agreement is much harder than prospective.
Longer than simpler projects. With an Agreed Surveyor, typically 3–5 weeks to Award. With separate surveyors, 5–8 weeks. Factor in the engineering review time — method statements need to be prepared and agreed before any Award can be served.
Party Wall Surveyors
Our role under the Act — and how to choose a competent surveyor.
Under Section 10 of the Party Wall etc. Act 1996, when a dispute arises, the matter must be resolved by party wall surveyors. Our surveyors hold MFPWS and MPTS accreditations. We act in three capacities:
Appointed by the building owner to guide them through the party wall process.
Appointed by the adjoining owner (at the building owner's expense) to safeguard their property.
A single surveyor appointed by both parties — the quickest and most cost-effective option.
Even if you decide not to appoint an Agreed Surveyor, it’s important the surveyor you choose is qualified, impartial, and available throughout the process.
A reliable surveyor doesn’t just issue an Award — they guide both owners, communicate clearly, and remain present until the works are complete. When deciding who to appoint, these are the questions to ask.
Tip: a good surveyor’s role is to balance both sides and prevent unnecessary delay or cost.
Tip: a dependable surveyor doesn’t disappear once the paperwork is complete.
A competent surveyor safeguards both properties, keeps the process fair and transparent, and helps maintain good relations between neighbours.
Before making a choice, take a moment to read their reviews, speak to them directly, and trust your sense of who genuinely prioritises protecting your property and peace of mind.
“Choosing a surveyor is as much about trust as qualification — the right one will treat your property as if it were their own, while staying fair to both sides.”
We tick all of the above.
Free, impartial advice from FPWS-qualified surveyors based in Wimbledon, working across all 33 London boroughs.
Get Free AdviceAs the building owner's appointed surveyor, we guide you through the entire party wall process. While appointed by you, we are required to act impartially. Our duties include: serving notices, reviewing drawings, carrying out a Schedule of Condition, negotiating with the adjoining owner's surveyor, and drafting the Party Wall Award.
Despite being appointed by the building owner, a party wall surveyor must act impartially. We ensure the adjoining owner's property is properly protected and the award is fair and balanced.
The building owner is responsible for all costs. We provide clear, competitive fixed-fee quotations at the outset.
Timescales depend on your neighbour's response: if they consent, works can start the next day. With an Agreed Surveyor, typically 2–3 weeks. With two surveyors, typically 3–5 weeks. Complex projects with multiple neighbours can take longer.
No. You must not start notifiable works until the award has been served. Starting without an award can lead to an injunction and liability for damages.
If consent is given, no award is required. However, we strongly recommend still obtaining a Schedule of Condition to protect both parties.
If you have received a party wall notice and choose to dissent, you are entitled to appoint your own surveyor — and the building owner pays our fees. Our duties include: reviewing notices, assessing proposed works, carrying out a Schedule of Condition, negotiating safeguards, and reviewing and agreeing the Party Wall Award.
We act independently and impartially, working constructively with the building owner's surveyor to reach a fair resolution while ensuring your property is protected.
The building owner pays the adjoining owner's surveyor fees. Appointing us typically costs you nothing.
No. You can consent to the works. However, if you dissent or do not respond, the Act requires surveyor appointment. Even with consent, we recommend a Schedule of Condition.
A surveyor cannot stop works outright. Our role is to ensure appropriate safeguards are in place. Breaches of the award can be enforced through the courts.
The Schedule of Condition provides the evidence base. The surveyor can determine responsibility and require the building owner to make good.
An agreed surveyor is a single party wall surveyor appointed by both parties to act impartially. Benefits include: quicker decisions, cheaper (one fee instead of two), simpler communication, and statutory impartiality.
An agreed surveyor may not be suitable for particularly complex works, pre-existing disputes between parties, where the adjoining owner requires independent representation, or where multiple adjoining owners have different concerns.
Both parties must agree in writing. Typically, the building owner proposes and the adjoining owner accepts. If they decline, each party appoints their own surveyor instead.
Yes. The agreed surveyor has a statutory duty of impartiality. Either party can appeal the award to the County Court within 14 days.
The building owner pays. Since there is only one surveyor, total costs are typically lower than the two-surveyor route.
A comprehensive record of an adjoining property's existing state before any works commence. It protects both sides: the building owner against false claims, and the adjoining owner by providing clear evidence of pre-works condition.
Internal: room-by-room assessment of walls, ceilings, floors. External: elevations, brickwork, roofline, boundaries. All with high-resolution photographs cross-referenced to written observations.
Drones are used where required.
Appended to the Party Wall Award. If damage is alleged after works, the schedule provides the objective baseline for comparison.
Not strictly mandatory in every case, but strongly recommended and standard practice. Most professional surveyors consider it essential.
This is noted in the award. It may weaken their position if they later claim damage was caused by the works.
Typically 30 to 45 minutes, depending on the size of the property and the areas to be recorded.
The Schedule of Condition should always be completed before works begin. The timing depends on which option the Adjoining Owner chooses:
In every case, the survey must be completed before any building work begins on site.
The building owner pays, included in our fixed-fee quotation.
Your Guide
Everything you need to know about your rights and obligations under the Act.
The Party Wall etc. Act 1996 provides a framework for preventing and resolving disputes in relation to party walls, boundary walls, and excavations near neighbouring buildings.
The Act covers three main areas: work on an existing party wall (Section 2), building new walls on or astride a boundary (Section 1), and excavation within specified distances of neighbouring buildings (Section 6).
A detailed overview of the Party Wall etc. Act 1996.
Section 1, Section 3, and Section 6 notices explained.
When and how surveyors are appointed.
The essential baseline record.
The legally binding document.
Common terms explained in plain English.
We provide free notice templates, letters of appointment, and a notice generator. Visit our Tools & Templates page.
Answer a few quick questions and find out instantly.
The Act came into force on 1 July 1997 and applies to England and Wales. It provides a framework for preventing and resolving disputes about party walls, boundary walls, and excavations near neighbouring buildings.
Notice before works, right to appoint surveyors, impartial dispute resolution, legally binding award, and right of appeal to the County Court.
← Back to Party Wall ActThe Party Wall etc. Act 1996 came into force on 1 July 1997 and applies to England and Wales.
No — Scotland and Northern Ireland have their own separate legislation covering similar matters.
Yes — under Section 10(17), either owner can appeal to the County Court within 14 days of being served the Award. The court can rescind, modify, or affirm the Award.
Required when building a new wall on the boundary. Must be served at least one month before works. Must describe the wall, its position, and whether it will be built wholly on your land or astride the boundary.
Covers works to existing party walls: cutting into, raising, reducing, demolishing, underpinning, inserting DPC. Must be served at least two months before works.
Required for excavation within 3 metres (below neighbour's foundations) or 6 metres (45-degree line). Must be served at least one month before works, with plans showing depth and any proposed underpinning.
14 days to respond in writing: consent, dissent and appoint a surveyor, or consent subject to conditions. No response = deemed dissent.
→ Received a notice? Read our step-by-step guide for adjoining owners
← Back to Party Wall ActThree: Section 1 Notice (new walls at the boundary, 1 month), Section 3 Notice / Party Structure Notice (works to existing party walls, 2 months), and Section 6 Notice (adjacent excavations, 1 month).
Only if the recipient has agreed in writing to accept service by email and has provided a valid email address. Otherwise, serve by hand or recorded delivery post.
A dispute is deemed to have arisen and surveyors must be appointed under Section 10. Silence does not stop the process — it moves into dispute resolution.
Statutory Reference
How surveyors are appointed under Section 10 of the Act.
When a dispute arises — i.e. an Adjoining Owner dissents or fails to respond within 14 days — surveyors must be appointed under Section 10 of the Party Wall etc. Act 1996.
Both parties appoint a single impartial surveyor. Fastest and most cost-effective.
Each party appoints their own. The two work together. If they cannot agree, they refer to the Third Surveyor.
Selected in advance by the two appointed surveyors. Acts as referee if needed.
Acting impartially, inspecting the site, preparing the Schedule of Condition, negotiating, drafting and serving the Award, and dealing with subsequent disputes.
Typically paid by the Building Owner. We provide clear fixed-fee quotations upfront — see our Fees & Process page for full details.
Looking to appoint a surveyor? For guidance on choosing a competent surveyor — and the questions to ask before you appoint one — see our Your Surveyor page.
A detailed record of the adjoining property's state before notifiable works begin. Creates an objective baseline for assessing damage claims. Appended to the Party Wall Award.
Not technically mandatory but strongly recommended and standard practice. Most surveyors consider it essential.
Room-by-room inspection with high-resolution photographs cross-referenced to written observations.
Drones are used where required. The report forms an appendix to the Award.
← Back to Party Wall ActNot strictly mandatory in every case, but strongly recommended and standard practice. Most professional surveyors consider it essential — it's the key evidence if damage is later alleged.
After the Party Wall Award has been agreed but before any works begin. This captures the exact state of the adjoining property as the baseline for comparison.
The building owner pays. The cost is typically included in the surveyor's overall fixed fee for the project.
The formal legal document produced by the appointed surveyor(s) that resolves the dispute and sets out how works are to be carried out.
Binding on both parties and their successors in title. Non-compliance can lead to injunctions and damages claims.
Either party may appeal to the County Court within 14 days. The court can rescind or modify the award. Appeals are uncommon. If no appeal is lodged, the award becomes final.
← Back to Party Wall ActGenerally 12 months from the date of service. If works haven't begun within that period, the Award lapses and a fresh notice and Award process is usually required.
Yes — the surveyors can issue an addendum or further Award if circumstances change, additional damage is discovered, or new issues arise during construction.
No — they are completely separate. Planning permission addresses local authority concerns about design and land use. A Party Wall Award addresses your private legal duties to neighbouring owners under the Act.
Every term you might encounter in a Party Wall Notice, Award, or correspondence — explained in plain English. Click any term to expand.
The legislation that provides a legal framework for building works near or on a boundary, shared wall, or adjoining structure. It sets out rights and duties for both Building Owners and Adjoining Owners.
The legal owner of a property next to or near the Building Owner's property. This includes freeholders, leaseholders (with leases over one year), or anyone with a registered interest affected by the works.
A single impartial surveyor appointed jointly by both the Building Owner and Adjoining Owner under Section 10(1)(a) of the Act. The Agreed Surveyor acts fairly for both sides and prepares the Party Wall Award.
The formal document issued by the Agreed Surveyor when acting for both owners — the same as an Award but produced by a single impartial surveyor.
Under the Act, the Building Owner (and their contractor) may have rights of access to the Adjoining Owner's property to carry out the works, provided proper notice is given and protections are in place.
Either owner may appeal an Award to the County Court within 14 days of it being served. Appeals must relate to a point of law, not personal preference.
A legally binding document prepared by the appointed surveyor(s). It sets out how and when the works can be carried out, access arrangements, protective measures, responsibilities for making good any damage, and rights of both owners. It is similar in effect to a contract between both parties.
The person (or company) carrying out the proposed building works. They are legally responsible for serving Notices and covering surveyor fees under the Act.
A post-works visit (if required) to confirm whether any damage has occurred and whether reinstatement is satisfactory.
When the Adjoining Owner agrees in writing to the works described in the Notice. No surveyor involvement is required unless the Adjoining Owner separately requests a Schedule of Condition.
A formal response served by the Adjoining Owner requesting modifications to the works (e.g., additional strengthening or other measures). It must be served within one month of the original Notice.
When the Adjoining Owner does not consent to the Notice. This does not mean a personal disagreement — it simply triggers the statutory procedure for appointing surveyor(s) to act impartially under the Act.
Defined by the Act as arising only when a Dissent is expressed or implied (i.e., no reply within 14 days). It is not personal conflict — simply a trigger for the statutory surveyor process.
Under the Party Wall etc. Act 1996 (Electronic Communications) Order 2016, Notices and correspondence may be served by email with written consent.
When a Building Owner makes use of an existing wall built by the Adjoining Owner (for example, a party wall previously constructed astride the boundary), they may be required to pay a fair contribution towards its cost.
Under the Act, the Building Owner usually covers all reasonable surveyor fees and costs, including preparation of the Award and Schedule of Condition.
The boundary line dividing two pieces of land. The Act regulates how new walls may be built on or up to this line.
Applies when a Building Owner wishes to build a new wall at or astride the boundary line between two properties. The Notice must be served at least one month before works begin.
Restoring any part of the Adjoining Owner's property that may be damaged as a result of the works, to its original condition or an equivalent standard.
A boundary wall (not part of a building) built astride the boundary line and used to separate two properties — often a garden wall made of masonry, not timber.
Includes floors, ceilings, and other structural elements separating parts of buildings belonging to different owners (e.g., flats).
A wall that separates two properties belonging to different owners and forms part of a building. The Building Owner must serve a Notice at least two months before cutting into, raising, or otherwise working on this wall.
A wall that stands on the land of two or more owners and forms part of a building. Common examples: shared walls between semi-detached or terraced houses.
Insurance that protects both parties in the unlikely event that a surveyor makes an error or omission while acting under the Act.
A written and photographic record describing the condition of the Adjoining Owner's property before works begin. It protects both parties should any damage occur later.
Relates to excavations or foundations within 3 or 6 metres of an Adjoining Owner's structure, depending on depth. A Notice must include plans and sections of the proposed works and be served at least one month before excavation begins.
If an Adjoining Owner fails to reply within the statutory time, the Building Owner may appoint a surveyor on their behalf so that the process can move forward lawfully.
A financial sum (held on account) that the Adjoining Owner can request before works begin, to cover possible costs of unfinished work or making good damage.
The legal delivery of a Notice to the Adjoining Owner — can be by hand, post, or email (if consented). The date of service starts the 14-day response period.
A person appointed under Section 10 of the Act to act impartially for both owners. They do not represent the person who appointed them — their duty is to the Act itself.
The authority given to surveyors under Section 10 to determine any matter connected with works covered by the Act, including damage, timing, access, and costs.
Under the Act, both freeholders and leaseholders (with leases longer than one year) may have rights as “owners.” Notifying all qualifying owners is a legal requirement.
A reserve surveyor chosen by the two appointed surveyors. If the two surveyors cannot agree on any matter, the Third Surveyor makes the final determination.
The Building Owner must serve Notice at least: 1 month before Section 1 works (new wall on boundary), 2 months before Section 3 works (party wall works), and 1 month before Section 6 works (adjacent excavation).
Once an Adjoining Owner has dissented and surveyors have been appointed, the process must continue to completion — it cannot be withdrawn mid-way without agreement of both parties and the surveyor(s).
Use our free templates or generate a notice automatically.
For Adjoining Owners
A plain-English guide to your options, the process, and what’s included — written for adjoining owners.
The formal Party Wall process and the involvement of surveyors can only take place once Party Wall Notices are served. If you’ve received a Notice, the Act exists to protect you — and to make sure the works next door happen fairly.
Key Term
The owner(s) proposing to carry out the building works.
Key Term
The neighbouring owner(s) whose property may be affected by those works. That’s you.
However the process unfolds, these are the stages you’ll hear about.
This step triggers the whole process. Building Owners are legally responsible for preparing and serving Notices on neighbours whose properties may be affected. Building Owners often ask a Party Wall Surveyor to prepare and serve them on their behalf — and it’s essential that Notices are valid and properly served. An invalid Notice can waste time and restart the clock.
A pre-works condition survey of the parts of your property that may be at risk or close to the proposed works. It documents the current condition of your property — a reference point — and the report is usually appended to the Party Wall Award so if anything goes wrong later, everyone knows exactly what was there before.
A legal document served on all parties. It sets out the scope, rights, and timings of the works, and clearly defines each party’s responsibilities. The Award typically includes plans, schedules, and the Schedule of Condition — and it protects both the Building Owner and the Adjoining Owner.
You have 14 days to respond. You can either consent or dissent.
No Party Wall Surveyor is involved. Within this route you have two sub-options:
1 (a)
You consent. No surveyor is involved. No survey of your property is carried out.
1 (b)
You consent but request a Schedule of Condition — carried out by a surveyor (not a Party Wall Surveyor) as a reference point for your property. A report goes to both owners. Any issues are handled directly between you and your neighbour.
Important: both consent options can only be chosen within the first 14 days.
A surveyor is involved. A Schedule of Condition and report are prepared by default, and a formal Award is served on both sides. You can choose how surveyors are appointed:
2 (a)
One surveyor represents both sides. Fastest and most cost-effective.
2 (b)
Two surveyors are appointed — each side has its own, and they work together throughout.
Option 1(b): A Schedule of Condition is prepared and given to both sides. No Party Wall Surveyor is involved — any issues are handled directly between the owners.
Option 2: A Party Wall Surveyor is involved to guide and mediate throughout the entire process.
If you don’t respond: after the initial Notice, a 10-day reminder letter can be served by the Building Owner’s surveyor. If that expires, they can appoint a surveyor on your behalf — and it’ll be a surveyor of their choice, not yours.
Good news: the surveyor’s fee is paid by the owner carrying out the building works — not you.
When we’re appointed as the Adjoining Owner’s surveyor, here’s what you get:
Ready to appoint us?
Appoint us as your Adjoining Owner’s Surveyor in 2 minutes — the Building Owner pays our fees, not you. Or download a blank template to fill manually.
Free, friendly advice. Surveyor’s fee paid by the building owner — not you.
For Building Owners
A plain-English guide to the Party Wall process, your responsibilities, and transparent fixed fees — so you can budget with confidence.
Our fee structure ensures that the owners proposing the works only pay for services actually carried out by a Party Wall Surveyor. The final fee depends on how your neighbours (Adjoining Owners) respond.
When you carry out works under the Party Wall etc. Act 1996, your neighbours must be formally notified. Each property may have more than one Owner (e.g. leaseholder + freeholder, sometimes including a management company) — which affects the number of Notices and the fee.
The process is really about your neighbour’s choices and which option they take.
Every Party Wall job follows the same three stages.
This starts the whole process. Notices must be served on every affected neighbour — that includes leaseholders, freeholders, and management companies. You can serve Notices yourself, or appoint us to prepare and serve them for you. Getting this right is critical: invalid Notices waste time and restart the clock.
A surveyor records your neighbour’s property condition before works start. This acts as a reference point — so if anyone later claims damage, it’s easy to see exactly what was there before. Protects both sides.
A legal document confirming how and when the works will be carried out. Required whenever a surveyor is appointed. It protects both sides and ensures the works are regulated under the Act. Plans and the Schedule of Condition are typically attached.
Your final fee depends on which route your neighbours choose. All fees shown are fixed — no hidden extras.
The cleanest outcome. Your neighbour consents to the works and no survey is required. Works can start the very next day.
1 Owner
£100
2 Owners
£200
3 Owners
£300
4 Owners
£400
Per Notice, per Owner. Amendments or additional Notices: £60 each.
Your neighbour consents but wants a survey of their property before works start — as a reference point in case damage is later claimed. No Party Wall Surveyor is involved; issues are handled directly between owners.
1 Owner
£500
2 Owners
£1,000
3 Owners
£1,500
4 Owners
£2,000
Schedule of Condition £300 + Notice £100 per owner.
Both parties use the same surveyor — fastest and most cost-effective route when a surveyor is required. We prepare the Schedule of Condition and the Party Wall Award and guide everyone through.
1 Owner
£1,200
2 Owners
£1,700
3 Owners
£2,200
4 Owners
£2,700
Discounted rates: We offer reduced fees on Agreed Surveyor appointments subject to T&Cs — no more than 5 hours spent; invoice settled within 7 days of presentation; a Google review posted within 14 days of Award service.
Two surveyors work together to agree the Schedule of Condition and Award. As the Building Owner you pay both surveyors’ fees — yours and your neighbour’s.
1 Owner
£800
2 Owners
£1,350
3 Owners
£1,900
4 Owners
£2,450
Building Owner Surveyor fee. The Adjoining Owner’s surveyor fee is separate and also paid by the Building Owner — see below.
AO Surveyor — Fixed Fee
£995
per AO
If the Adjoining Owner appoints us as their surveyor under Option 3, the fee is a flat £995 per Adjoining Owner — payable by you (the Building Owner) under Section 11 of the Party Wall etc. Act 1996.
Option 1 must be chosen by the neighbour within 14 days of the Notice being served. If no response is received, a dispute is automatically deemed to exist — then only Options 2 or 3 are available. A reminder letter can be sent giving 10 additional days; if there’s still no response, only Option 3 remains.
1(b): Schedule of Condition is prepared — no Party Wall Surveyor involved. Issues handled directly between the owners.
Option 2: A Party Wall Surveyor is involved to guide and mediate throughout the process.
How quickly you can start works depends on which option your neighbour takes.
Option 1(a)
Works can start the next day. The process finishes when the neighbour provides consent.
Option 1(b)
Works can start once the Schedule of Condition report has been shared with both parties.
Option 2
Typically 2–3 weeks to complete the full process.
Option 3
Typically 3–5 weeks. Can take longer if the other side’s owner or surveyor doesn’t engage promptly.
When we’re appointed as your (Building Owner) or Agreed Surveyor, here’s what you get:
It’s our firm’s policy to make sure you’re comfortable with the fee before we go any further. Once confirmed, these are the main stages:
Talking to your neighbours directly about party wall matters — before Notices land on the doormat — can reduce costs and speed up the whole process. Neighbours are often happy to agree to your chosen surveyor as the Agreed Surveyor, or to propose their own preferred surveyor for mutual agreement.
Ready to appoint us?
Sign your Letter of Appointment online in 2 minutes — or download a blank template to fill manually.
Fixed fees, no hidden extras. We confirm everything in writing before we start.
Statutory Reference
Every statutory right, every notice type, every common project — in one place.
The Party Wall etc. Act 1996 gives building owners specific statutory rights to carry out works that affect neighbouring properties. Every right sits under Section 1 (new walls at the boundary), Section 2 (works to existing party structures), or Section 6 (adjacent excavations).
Click a project to highlight the works it typically engages:
Everything that connects to the works above.
How we review your proposed works to identify exactly which statutory rights and notices apply.
Download Section 1, Section 3, and Section 6 notice templates — ready to complete and serve.
Our guided generator drafts your notice automatically based on the works you select.
Send us your drawings — we'll tell you exactly which notices you need. Free, no obligation.
Get Free AdviceFree Resources
Free party wall resources to help you understand the process, check your obligations, and get started.
Unlike most firms, we provide free online tools so you can understand the process before you instruct anyone.
Download blank templates for Section 1, Section 3, Section 6 notices and the Response Form.
Download →Our guided wizard drafts your party wall notice automatically in four steps.
Generate →Formally appoint your surveyor online — fill in, sign digitally, or send via email.
Appoint →Quick quiz to check if the Party Wall Act applies to your building works.
Check Now →Our surveyors can guide you through every stage — completely free.
Get Free AdviceFree templates to serve or respond to notices. We recommend professional advice before serving any notice.
Formally appoint your surveyor under the Act. Fill online, download, or email.
Complete the form on screen, draw your signature, and submit. Both you and the surveyor receive a copy instantly.
Download a blank template, print it, fill in your details and sign by hand, then upload the signed copy back to us.
Enter your details, we pre-fill the appointment letter, and your email app opens ready to send. Quick and simple.
Guided Wizard
Draft your party wall notice in four steps — no surveyor knowledge required.
Pick the project that best matches your proposed works. We'll use this to suggest the statutory rights that usually apply.
These are the statutory rights typically engaged by your project. Tick every one that applies — and for alternatives (marked Either / Or), pick one.
We'll merge these into your notice draft. All fields are used only in your browser — nothing is sent anywhere.
JOINT ADJOINING OWNERS: A separate notice must be served on each named owner. Service is only valid where the notice has been delivered to (or properly substituted on) every owner — make sure all owners are named here so each receives their own copy.
Review your drafts below. You can save as PDF, email them to yourself, or ask us to serve them professionally on your behalf.
Insights & Advice
Practical guidance on the Party Wall Act, notices, surveyors, and common questions.
Answers to the questions we hear most often.
Date
Get in Touch
Free advice, no obligation. Tell us about your project and we'll get back to you within 24 hours.
Tell us about your project and we'll be in touch within 24 hours.
The Old Church, 89B Quicks Road
Wimbledon, London SW19 1EX
Mon – Fri: 9:00am – 6:00pm
We aim to respond within 24 hours
Click any borough or surrounding area for local information
We Review
Your message is read by a surveyor
Free Call-Back
Within 24 hours
Clear Advice
No obligation, no charge
Fully Accredited & Insured
MPTS
PI £5m
150+
Five-Star Reviews
50+
Areas Covered
FPWS
MPTS & ACABE Accredited
£5m
Professional Indemnity
Real Google Reviews
★★★★★ 150+ Five-Star Reviews
Trusted by homeowners, developers, architects, and housing associations across London.
★★★★★
“Tim has been great from start to finish, with excellent communication throughout the process. I couldn’t recommend highly enough!”
— Peter Moorhead
★★★★★
“Tim was just what we needed. Efficient, helpful and knowledgable. He made it a very smooth process. Would highly recommend.”
— Isabelle Le Riche
★★★★★
“I would highly recommend Tim. He was a fantastic help to ensure that I got the outcome I was after. 10/10”
— Dan Gray
★★★★★
“Very good quality of service and helped through beyond party wall needs. Knowledgable and highly recommended.”
— Rajasankar R.
★★★★★
“Excellent service from Tim — very accommodating and supportive throughout. I would highly recommend.”
— Karen Hayles
★★★★★
“Tim was very supportive and offered professional advice which helped us to resolve the issues quickly. Thank you.”
— Dianne Friday
★★★★★
“Tim was exceptionally helpful in providing prompt and insightful advice on a time-sensitive matter.”
— Paul Arthur
★★★★★
“Excellent work by Tim Haq in preparing and organising party wall notices. Very helpful, prompt and efficient.”
— Richard Parry
★★★★★
“Tim was great; very responsive, reassuring and patient in his guidance. Highly recommended.”
— Simon Wongsuwarn
★★★★★
“An absolute pleasure to work with. 10/10. Cannot recommend enough! Very helpful and informative.”
— Hanifa Islam
★★★★★
“Tim has been great from start to finish, with excellent communication throughout the process. I couldn’t recommend highly enough!”
— Peter Moorhead
★★★★★
“Tim was just what we needed. Efficient, helpful and knowledgable. He made it a very smooth process. Would highly recommend.”
— Isabelle Le Riche
★★★★★
“I would highly recommend Tim. He was a fantastic help to ensure that I got the outcome I was after. 10/10”
— Dan Gray
★★★★★
“Very good quality of service and helped through beyond party wall needs. Knowledgable and highly recommended.”
— Rajasankar R.
★★★★★
“Excellent service from Tim — very accommodating and supportive throughout. I would highly recommend.”
— Karen Hayles
★★★★★
“Tim was very supportive and offered professional advice which helped us to resolve the issues quickly. Thank you.”
— Dianne Friday
★★★★★
“Tim was exceptionally helpful in providing prompt and insightful advice on a time-sensitive matter.”
— Paul Arthur
★★★★★
“Excellent work by Tim Haq in preparing and organising party wall notices. Very helpful, prompt and efficient.”
— Richard Parry
★★★★★
“Tim was great; very responsive, reassuring and patient in his guidance. Highly recommended.”
— Simon Wongsuwarn
★★★★★
“An absolute pleasure to work with. 10/10. Cannot recommend enough! Very helpful and informative.”
— Hanifa Islam
Read more reviews on this site →Read all 150+ reviews on Google →Leave us a Google review →
Free Online Tool
Answer a few quick questions to find out if your building works require a notice under the Party Wall etc. Act 1996.
Select the option that best describes your project.
Think about the shared wall or boundary between properties.
This determines which section of the Act applies.
The Party Wall Act can be complicated. Send us your plans or a quick description and we'll tell you exactly what you need — completely free.
Get Free Advice Call Us NowFree, no-obligation project review from qualified party wall surveyors.
Get Free AdviceFree Online Tool
Get an instant indicative quote for your party wall surveyor fees. Fixed fees, no hidden costs.
Answer 4 quick questions for an indicative fee range.
How many neighbours are affected by the works?
If the adjoining owner agrees, one surveyor can act for both parties (saving costs).
No hourly rates, no surprises. You know exactly what you'll pay from day one.
Notices, awards, schedules of condition, site visits — everything included in one fee.
Building owners: we can act as agreed surveyor, meaning you only pay one fee instead of two.
Send us your project details for a firm, fixed-fee quote — free and no obligation.
Get Your QuoteInteractive Guide
Follow the steps to understand exactly where you are in the process and what happens next.
Select your role to see the process that applies to you.
Before any notifiable work can start, you must serve the correct Party Wall Notice on every affected adjoining owner.
Which notice applies?
Section 1 — building a new wall on or at the boundary · 1 month
Section 3 — works to an existing party wall (cutting in, raising, underpinning, chimney removal) · 2 months
Section 6 — excavation within 3m or 6m of an adjoining structure · 1 month
What the notice must contain
How to serve
Once served, your neighbour has 14 days to respond. Continue when they do.
Within 14 days of receiving your notice, your neighbour must consent, dissent, or stay silent (which counts as a deemed dispute).
14 days from service — no response means a dispute has arisen.
How did your neighbour respond?
Your neighbour has agreed in writing. No surveyor is needed. You can start works immediately, keeping the agreed start date and complying with the notified works.
Your neighbour consents but wants their property recorded before works start. A surveyor carries out the Schedule of Condition. Once complete, works can begin.
A dispute has arisen. Surveyors must now be appointed under Section 10 of the Act.
How will surveyors be appointed?
Silence past the 14-day response period is a deemed dispute under Section 10(1)(b) of the Act. The next step is the formal 10-day letter.
What is the 10-day letter?
Under Section 10(4)(a) of the Act, if the adjoining owner has not appointed a surveyor within 14 days of your notice, you may serve a request giving them a further 10 days to appoint one.
The letter must be served in writing, identify the notice served, and state that failure to appoint within 10 days will lead you to appoint a surveyor on their behalf.
Still no response after 10 days
Under Section 10(4)(b), you may then appoint a surveyor on your neighbour’s behalf. The dispute is resolved between the two surveyors, just like Option 3.
What happens next depends on the outcome of the 10-day letter:
You appoint a surveyor on the adjoining owner’s behalf (not your own surveyor — must be independent)
You also appoint your own surveyor
The two surveyors agree a Schedule of Condition and prepare the Award
Works can begin once the Award is served
Both parties appoint one Agreed Surveyor
Schedule of Condition carried out
Party Wall Award prepared and served
Works can begin
Each party appoints their own surveyor
Schedule of Condition carried out
Two surveyors agree the Award together
Works can begin
Your neighbour is planning works. You have 14 days to respond. Here are your options:
You agree to the works. No surveyor is involved. The building owner can proceed after the notice period. This costs you nothing.
You consent but request a Schedule of Condition. A surveyor records your property’s condition before works start. The building owner pays for this. This protects you if damage occurs.
Full Guide for Adjoining OwnersYou and your neighbour appoint one surveyor to act impartially for both sides. The surveyor carries out a Schedule of Condition, then prepares and serves the Award. Works can begin once the Award is served.
You appoint your own surveyor. The two surveyors work together to agree the Schedule of Condition and Award before works can begin.
Call us or send a message. We’ll explain your options clearly and walk you through the next steps.
Free, no-obligation advice from qualified party wall surveyors.
Get Free AdviceData Controller: Party Wall Specialists Limited, The Old Church, 89B Quicks Road, Wimbledon, London SW19 1EX
Company No: 11019442
Contact: admin@partywallspecialists.com
We are committed to protecting your privacy and handling your personal data in accordance with the UK General Data Protection Regulation (UK GDPR).
We process personal data under the following lawful bases as defined by UK GDPR (Articles 6 and 9):
| Purpose | Lawful Basis |
|---|---|
| Responding to enquiries | Legitimate interest |
| Providing surveying services | Performance of a contract |
| Serving and receiving statutory notices under the Party Wall etc. Act 1996 | Legal obligation / Legitimate interest |
| Obtaining Land Registry title registers to identify property owners | Legitimate interest |
| Issuing invoices and processing payments | Performance of a contract |
| Website analytics (Google Analytics) | Consent |
We may share personal data with:
We do not sell personal data to third parties or use it for marketing purposes.
| Data Type | Retention Period |
|---|---|
| General enquiries | 2 months after resolution |
| Client project files (notices, awards, schedules) | 2 years after project completion |
| Financial records | 6 years (HMRC requirement) |
| Website analytics data | 14 months (Google Analytics default) |
This website uses Google Analytics 4 to collect anonymous usage data. Analytics cookies are only set with your consent. See our Cookie Policy for full details.
You have the right to:
To exercise any of these rights, contact admin@partywallspecialists.com. We will respond within 30 days.
We may use artificial intelligence (“AI”) tools to assist with administrative work such as drafting routine correspondence, formatting party wall notices, summarising plans, and reviewing documents.
We implement appropriate technical and organisational measures to protect personal data, including encrypted email where possible, secure cloud storage, and restricted access to client files.
If you are not satisfied with how we handle your data, you have the right to lodge a complaint with the Information Commissioner’s Office (ICO):
ico.org.uk | 0303 123 1113
Last updated: April 2026
This website is hosted on DreamHost and uses a small number of cookies to function properly and to help us understand how visitors use the site. This policy explains what cookies we use, why, and how you can control them.
Cookies are small text files stored on your device when you visit a website. They help websites remember your preferences and understand how you interact with the site.
| Cookie | Type | Purpose | Duration |
|---|---|---|---|
| cookie_consent | Essential | Remembers your cookie preference so the banner is not shown again. | 1 year |
| _ga, _ga_* | Analytics | Google Analytics 4 — measures how visitors use the site (pages visited, time on site). Data is anonymised and not used for advertising. | 2 years |
| _gid | Analytics | Google Analytics — distinguishes unique visitors. | 24 hours |
This website is hosted on DreamHost. DreamHost does not set tracking cookies on your device. Server access logs are retained for up to 7 days for security and performance purposes, in line with DreamHost's privacy policy.
We use Google Analytics 4 (GA4) to understand how visitors use our website. Analytics cookies are only set if you click "Accept" on the cookie banner. If you decline, no analytics cookies are placed and no tracking occurs. Google Analytics data is anonymised and is not shared with third parties or used for advertising. See Google's Privacy Policy.
We rely on your consent for analytics cookies, as required by the UK GDPR and the Privacy and Electronic Communications Regulations 2003 (PECR). Essential cookies (cookie consent preference) are placed under our legitimate interest in operating the website.
If you have questions about our use of cookies, contact us at admin@partywallspecialists.com.
Last updated: April 2026
We are committed to a high standard of service. Three stages:
Raise your concern with the surveyor handling your case. We aim to resolve within 5 working days.
Write to admin@partywallspecialists.com with subject "Formal Complaint". Include your details, property address, surveyor name, description, and desired outcome. We acknowledge within 5 working days and respond within 20 working days.
Award disputes are statutory matters — refer to the Third Surveyor or appeal to the County Court within 14 days.
You agree to assist the surveyor in performing their role by:
Party Wall Specialists Limited
The Old Church, 89B Quicks Road, Wimbledon, London SW19 1EX
admin@partywallspecialists.com
Company Registered in England and Wales under Company No: 11019442
Last updated: April 2026
Tim Haq
ACABE — Associate Member of ‘Chartered Association of Building Engineers’.
Prince 2 — APMG International Prince 2 — Project Management successful candidate.
MFPWS — Member of ‘Faculty of Party Wall Surveyors’.
MPTS — Member — Pyramus and Thisbe Society.
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.
If you have received this email in error, please notify our Admin Team on admin@partywallspecialists.com.
This message contains confidential information and is intended only for the individual named. If you are not the named addressee, you should not disseminate, distribute or copy this email. Please notify the sender immediately by email if you have received this email by mistake and delete this email from your system.
Party Wall Specialists Limited accepts no liability for the content of this email, or for the consequences of any actions taken on the basis of the information provided unless that information is subsequently confirmed in writing. If you are not the intended recipient, you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.
Any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the company. Employees of Party Wall Specialists are expressly required not to make defamatory statements and not to infringe or authorise any infringement of copyright or any other legal right by email communications. Any such communication is contrary to organisational policy and outside the scope of the employment of the individual concerned. The company will not accept any liability in respect of such communication, and the employee responsible will be personally liable for any damages or other liability arising.
Please note, all information we keep or share is what is available to the public. We may search the Land Registry portal for Title Registers to acquire rightful Owner’s details.
Computer viruses can be transmitted via email. The recipient should check this email and any attachments for the presence of viruses. Party Wall Specialists Limited accepts no liability for any damage caused by any virus transmitted by this email. Email transmission cannot be guaranteed to be secure or error-free, as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender, therefore, does not accept liability for any errors or omissions in the contents of this message which arise as a result of email transmission.
Party Wall Specialists Limited
The Old Church, 89B Quicks Road, Wimbledon, London SW19 1EX
admin@partywallspecialists.com
Company Registered in England and Wales under Company No: 11019442
Last updated: April 2026
Party Wall Specialists Limited is committed to ensuring digital accessibility for people with disabilities. We are continually improving the user experience for everyone and applying the relevant accessibility standards.
This website is designed to be compatible with the following assistive technologies:
We are aware that some areas of the website may not yet be fully accessible. We are working to address these and welcome your feedback.
If you experience any difficulty accessing content on this website, please contact us:
Party Wall Specialists Limited
The Old Church, 89B Quicks Road, Wimbledon, London SW19 1EX
admin@partywallspecialists.com
020 8545 2680
We aim to respond to accessibility feedback within 5 working days.
Last updated: April 2026
What Our Clients Say
150+ five-star Google reviews from Building Owners, Adjoining Owners, architects, and developers across London.
5.0 / 5.0
★★★★★ 150+ Google Reviews
★★★★★
“Very good quality of service and helped through beyond party wall needs. Knowledgable and highly recommended.”
— Rajasankar Rajagopal
★★★★★
“Tim is a very experienced and thoughtful partywall surveyor. would definitely use/recommend his services.”
— Rahul Rattan
★★★★★
“Tim was very supportive and offered professional advice which helped us to resolve the issues quickly. Thank you”
— Dianne Friday
★★★★★
“I would highly recommend Tim. He was a fantastic help to ensure that I got the outcome i was after. 10/10”
— Dan Gray
★★★★★
“Tim was quick to respond to a query I had and was very helpful resolving some issues. Highly recommended.”
— Suku
★★★★★
“Thank you very much Sir.\nYou were my lowest quote.\nProfessional service.\nHighly recommended.\n5 Stars 🌟”
— SD J
★★★★★
“Excellent service from Tim — very accommodating and supportive throughout. I would highly recommend.”
— Karen Hayles
★★★★★
“Tim was exceptionally helpful in providing prompt and insightful advice on a time-sensitive matter.”
— Paul Arthur
★★★★★
“Tim was just what we needed. Efficient, helpful and knowledgable. He made it a very smooth process. Would highly recommend.”
— Isabelle Le Riche
★★★★★
“An absolute pleasure to work with. 10/10. Cannot recommend enough!! Very helpful and informative”
— Hanifa Islam
★★★★★
“Brilliant job by Tim, took time out to explain all the rules and regs and was very thorough.”
— M Nasir
★★★★★
“Excelllent work by Tim Haq in preparing and organising party wall notices. Tim was very helpful as well as prompt and efficient.”
— Richard Parry
★★★★★
“Tim has been great from start to finish, with excellent communication throughout the process. I couldn’t recommend highly enough!”
— Peter Moorhead
★★★★★
“Excellent service, always kept me in the loop and really professional. Happy with service.”
— Saff
★★★★★
“Tim was great; very responsive, reassuring and patient in his guidance. Highly recommended”
— Simon Wongsuwarn
★★★★★
“Tim is extremely professional. Throughout the process, he is always there to help and offer his professional opinion. Thank you Tim.”
— Positive Progression
★★★★★
“Tim was extremely prompt and helpful regarding all aspects. He made the process seemless and stress free. I highly recommend using him.”
— Kishen Patel
★★★★★
“Very understanding, efficient and they know what they are doing. Also want to help”
— Elizabeth Anderson
★★★★★
“Provide a very professional service at a fair fixed price even if interaction with the adjoining property surveyor requires a lot of work.”
— Jason Bowsher
★★★★★
“Dealt with Tim. Competitive price and excellent service. I would have no trouble in recommending to friends/family based on my experience.”
— Will Cassar
★★★★★
“Neighbours were doing work and Tim was great in providing unbiased info to me and eventually reviewing the property for the final agreement.”
— Steve Darnell
★★★★★
“Tim and his team did an amazing work.\nVery professional company.\nSupper happy with everything.\nI would definitely use them again if I need to”
— Slavi Todorov
★★★★★
“Would highly recommend Tim for any party wall matters, great communication and helped take the stress out of a particularly awkward situation!”
— Jac Trickett
★★★★★
“Great service. Quick to reply. Very professional. Would definitely recommend.”
— Beatriz Mariño
★★★★★
“Very good service from Tim. Communication and standard of work excellent”
— Nick Hoareau
★★★★★
“Very attentive to detail, well spoken, polite, patient and supportive.”
— Tandiwe Sithole
★★★★★
“Tim is very professional and is very prompt with his communication. Would strongly recommend to anyone who is in need of any party wall consultation.”
— Murali Sivanandan
★★★★★
“Tim conducted himself professionally and I’d definitely use him again.”
— Brent Petersen
★★★★★
“Tim was fab, replied with lightning quick speed, was super polite with neighbours and whole process went very smoothly. Would use again and recommend.”
— Adam Shonfeld
★★★★★
“Tim, was very helpful and understood my\nconcerns. He explained everything to me about the party wall process and any questions I had he could answer.”
— Lorraine Legister
★★★★★
“Tim was extremely pleasant and easy to deal with. He was responsive, prompt and very professional in all aspects of arranging the party wall agreements.”
— Jake Powrie
★★★★★
“Excellent service!!! Very professional!!! Keep up the good work ..”
— Zaheer Ibrahim
★★★★★
“Excellent service by telephone did not want any money but very concerned about me and the work I was thinking of getting done good advice thank you so much”
— selvi daniel
★★★★★
“Very helpful, and offers both paid services as well as general advice. Looks to solve your issues proactively rather than just charge you an arm and a leg.”
— Edward Bennett
★★★★★
“Tim helped me with my party wall agreements, he took time to explain everything to me thoroughly on the phone and throughout the process. Thanks so much Tim!”
— Siobhan Quinn
★★★★★
“Clear advice, speedy service, no complaints. Thank you Tim!”
— Jason Rajamogan
★★★★★
“Outstanding service. Tim is highly professional, responsive, and exceptionally efficient. We would gladly use his services again in the future without hesitation.”
— Olivia Oragui
★★★★★
“Great company I would definitely recommend in the future”
— Josh Healey
★★★★★
“Amazing service from this company from start to finish. Very personal service, extremely efficient and always explained the process along the way. Highly recommended.”
— Juliet Ramsey
★★★★★
“Tim was very helpful and provide lots of advice over the phone (for free) which I was very grateful for. He was prompt in responding to emails and met my expectations.”
— a lyt
★★★★★
“Reliable informative and prompt service provided”
— hemant patel
★★★★★
“Wonderful quality of service. Tim was very helpful and provided good advice. Resolved the matter quickly. I would recommend Party Wall Specialists. You will not regret it.”
— Patricia Haywood
★★★★★
“Tim is so helpful and happy to go above and beyond. We secured a party wall agreement with both neighbours in a timely and more than satisfactory way. I would highly recommend.”
— Lisa Kunwar
★★★★★
“Great service from Tim - highly recommend!!”
— Luke Kievenaar
★★★★★
“Great service! Very thorough and nice guy!”
— Q
★★★★★
“Polite, good communication and efficient”
— nicholas Tiffin
★★★★★
“I used Tim from the Party Wall Specialists to get my Party Wall Agreements in place with my neighbours. Tim was extremely helpful throughout the process and I would highly recommend.”
— Andrew Carasco
★★★★★
“Instructed Tim to carry out a survey and make Party Wall agreement on short notice and I wasn't disappointed. He was higly professional and good value for money.\n\nHighly Recommended.”
— Fahad Mahmood
★★★★★
“We have been very impressed and would highly recommend using this company. Tim was very quick, efficient and helpful through the process keeping us updated on the progress throughout.”
— Beth Tyler
★★★★★
“Tim from Party Wall Specialists was extremely helpful, answering questions and explaining things very clearly. He is a great communicator and acted quickly in the time frames we required.”
— Fiona Gatto
★★★★★
“Working with Tim at Party Wall Specialists was great - he was clear, efficient and professional and made the whole process super easy. Definitely took the stress out of this part of the process!”
— Becky L
★★★★★
“Experience & Professional”
— Imran Khan
★★★★★
“Tim Haq is very competent and professional in handling our party wall award (Agreed Surveyor). He was able to clearly explain any issues and suggested possible resolutions. Recommended. Thanks once again!”
— Tiancong Liang
★★★★★
“I was recommended these surveyors by my builder. Very professional, attentive and very reasonable on fees. I dealt with Tim who was available to speak with me even outside of office hours! High recommended!”
— Ben Perl
★★★★★
“I would highly recommend Tim. The process would not be as smooth without his help. He always responds quickly and is patient in explaining all the details. This truly helps us to be on time to start the work.”
— Zeting Li
★★★★★
“Tim was recommended by our structural engineer. From start to finish he was professional, prompt and attended to the matter efficiently and effectively. Reasonably priced and I would not hesitate to use again.”
— Mana Mahil
★★★★★
“Our experience with Party Wall Specialist is excellent. Tim is our go to contact point. Not only that he is so professional, but also that he is very experienced and performed his great people skill to resolve a few party wall related issues for us. Tim is also one of the most responsive person we met. We cannot recommend him enough.”
— Tony Shek
★★★★★
“We had instructed Tim.Haq for our party wall works back in June 2019\nIt has been some what of a great experience for us as a family to find a company that cares and put there clients Interest first.\nTim’s commitment has been 100% to today’s date (19th March 2020.)\nWe had very difficult neighbour and once again Tim had handle our neighbour like a baby which wasn’t his job and saved us lots of costs and time with neighbours surveyors.\nA BIG THANK YOU\nJay. Croydon”
— diya patel
★★★★★
“Tim was extremely helpful at guiding me through the process of party wall agreements. He quoted me an excellent price and went over and above to provide additional information and paperwork. He was able to meet our very short deadline. An excellent service and highly recommended.”
— Lynsey Luff
★★★★★
“Brilliant and efficient service from start to finish. One stop shop !!. Very polite service, prompt in answering calls, fast turn around, spends lots of time with client and good industry knowledge. I will be more than happy to recommend Party Wall Specialists LTD to anyone. Professional charges are very reasonable as well.”
— Ariaratnam Sakthitharan
Showing 60 of 150+ reviews. Read all on Google, or leave your own if we have worked together.
Free advice, fixed fees, London-wide. Get in touch for a no-obligation chat about your project.
Get Free AdvicePlanning Works That Affect A Neighbour
A plain-English summary of the process, our fees, and how we help. Written for building owners.
When you carry out works that affect a shared wall, structure, or boundary, you are legally required to serve Party Wall Notices on your neighbour(s) before works begin. The Party Wall etc. Act 1996 exists to protect everyone involved and to make sure works happen fairly.
Key Term
The owner(s) proposing to carry out the building works. That's you.
Key Term
The neighbouring owner(s) whose property may be affected. Each property may have more than one Owner (leaseholder, freeholder, management company).
This is how the process unfolds in practice.
You are legally responsible for preparing and serving Notices on all affected neighbours. You can serve them yourself, or appoint us to do it for you. Notices must be valid and properly served — an invalid Notice restarts the clock.
A surveyor records the neighbour's property condition before works begin. If damage is later claimed, the SoC is the reference point for what was there beforehand — protecting both parties.
A legal document served on all parties, setting out how and when works will be carried out. Protects both sides and ensures works proceed within the Act.
Your neighbour has 14 days to respond. Your total cost depends on their choice.
£100
per Notice, per Owner
Your neighbour consents. No surveyor is appointed. No survey is carried out. Works can start the next day.
2 owners £200 · 3 owners £300 · 4 owners £400 · amendments / additional Notices £60
£500
per Owner (SoC £400 + Notice £100)
Your neighbour consents but requests a Schedule of Condition as a reference point. A surveyor (not a Party Wall Surveyor) carries out the survey; the report goes to both sides. Works can start 2–3 days after the survey.
2 owners £1,000 · 3 owners £1,500 · 4 owners £2,000
£1,200
per Owner — reduced rate
Both sides use the same surveyor. The surveyor prepares the Schedule of Condition and Party Wall Award and mediates throughout. Fastest and most cost-effective dissent route — typically 2–3 weeks.
2 owners £1,700 · 3 owners £2,200 · 4 owners £2,700
Discounted rate T&Cs apply: max 5 hours, invoice settled within 7 days, Google review posted within 14 days of Award.
£800
BO Surveyor fee only
Each side appoints its own surveyor. The two surveyors work together to prepare the Schedule of Condition and Award. Typically 3–5 weeks. As the Building Owner, you are also responsible for the Adjoining Owner's reasonable surveyor fees (similar amount).
2 owners £1,350 · 3 owners £1,900 · 4 owners £2,450
If your neighbour doesn't respond within 14 days, a 10-day reminder letter is served. If that expires, a dispute is automatically deemed — and only Option 3 becomes available.
When we're appointed as the Building Owner's (or Agreed) Surveyor, you get:
Talk to your neighbour before Notices are served. Most party wall problems dissolve over a cup of tea. Neighbours are often happy to accept your chosen surveyor as the Agreed Surveyor (Option 2) — or to propose one of their own for mutual agreement. Either way, it's faster and cheaper than separate surveyors under Option 3.
Ready to appoint us?
Sign your Letter of Appointment online in 2 minutes — or download a blank template to fill manually.
Free 15-minute call. No obligation. Tell us about your project and we'll explain your obligations.
Send An EnquiryReceived a Notice, Or Worried About Works Next Door
A plain-English summary of your rights, your options, and what's included — at no cost to you.
If you've received a Party Wall Notice, your neighbour (the Building Owner) is proposing works that fall within the Party Wall etc. Act 1996. The Act exists to protect you — and to ensure the works next door happen fairly and without damage to your property.
Key Term
The owner(s) proposing to carry out the building works — your neighbour.
Key Term
The neighbouring owner(s) whose property may be affected by those works. That's you.
You don't pay us.
Your Building Owner neighbour is responsible for your reasonable surveyor fees. Our appointment, Schedule of Condition, and the Party Wall Award are all at no cost to you.
Fixed Fee
£995
fixed fee
For acting as your Adjoining Owner’s Surveyor. A flat £995 covers our full appointment — reviewing drawings, Schedule of Condition, negotiating, and serving the Party Wall Award.
Paid by the Building Owner under Section 11 of the Party Wall etc. Act 1996 — not by you.
You have 14 days from when Notices are served to respond. You can either consent or dissent.
No Party Wall Surveyor is involved. Within this route you have two sub-options:
1 (a)
You consent. No surveyor is involved. No survey of your property is carried out.
1 (b)
You consent but request a Schedule of Condition — a pre-works record of your property. Any issues are handled directly between you and your neighbour.
Important: both consent options can only be chosen within the first 14 days.
A surveyor is involved. A Schedule of Condition and a formal Party Wall Award are prepared.
Option 2
One surveyor represents both sides. Fastest & most cost-effective for your neighbour — and still impartial to you.
Option 3
You appoint your own surveyor. The two surveyors work together throughout the process.
Option 1(b): A Schedule of Condition is prepared and given to both sides. No Party Wall Surveyor is involved — any issues are handled directly between the owners.
Option 2: A Party Wall Surveyor is involved to guide, mediate and issue a formal Award throughout the process.
If you don't respond within 14 days, a 10-day reminder letter is served. If that expires, a dispute is automatically deemed — and your Building Owner's surveyor can appoint a surveyor on your behalf. Best to respond early and choose your own.
However the process unfolds, these are the stages you'll hear about.
This step triggers the whole process. Building Owners are legally responsible for serving valid Notices on you. Check the Notice carefully — the clock only starts from a validly-served Notice.
A pre-works survey of the parts of your property that may be affected. Documents the current condition as the reference point — if anything goes wrong later, it's the record of what was there before.
A legal document served on all parties. It sets out the scope, rights, and timings of the works, and each party's responsibilities. Typically includes plans, schedules, and the Schedule of Condition.
When we're appointed as the Adjoining Owner's (or Agreed) Surveyor, you get:
Ready to appoint us?
Appoint us as your Adjoining Owner’s Surveyor in 2 minutes — the Building Owner pays our fees, not you. Or download a blank template to fill manually.
Free, friendly advice. Surveyor's fee paid by the Building Owner — not you.
Send An EnquiryIntroduced by a trusted partner
A plain-English summary of the process, our fees, and how we help.
Our fee structure ensures that the owners proposing the works only pay for services actually carried out by a Party Wall Surveyor. The final fee depends on how your neighbours (Adjoining Owners) respond.
When you carry out works under the Party Wall etc. Act 1996, your neighbours must be formally notified. Each property may have more than one Owner (e.g. leaseholder + freeholder, sometimes including a management company) — which affects the number of Notices and the fee.
The process is really about your neighbour's choices and which option they take.
Every Party Wall job follows the same three stages.
This starts the whole process. Notices must be served on every affected neighbour — that includes leaseholders, freeholders, and management companies. You can serve Notices yourself, or appoint us to prepare and serve them for you. Getting this right is critical: invalid Notices waste time and restart the clock.
A surveyor records your neighbour's property condition before works start. This acts as a reference point — so if anyone later claims damage, it's easy to see exactly what was there before. Protects both sides.
A legal document confirming how and when the works will be carried out. Required whenever a surveyor is appointed. It protects both sides and ensures the works are regulated under the Act. Plans and the Schedule of Condition are typically attached.
Your final fee depends on which route your neighbours choose. All fees shown are fixed — no hidden extras.
The cleanest outcome. Your neighbour consents to the works and no survey is required. Works can start the very next day.
1 Owner
£100
2 Owners
£200
3 Owners
£300
4 Owners
£400
Per Notice, per Owner. Amendments or additional Notices: £60 each.
Your neighbour consents but wants a survey of their property before works start — as a reference point in case damage is later claimed. No Party Wall Surveyor is involved; issues are handled directly between owners.
1 Owner
£500
2 Owners
£1,000
3 Owners
£1,500
4 Owners
£2,000
Schedule of Condition £400 + Notice £100 per owner.
Both parties use the same surveyor — fastest and most cost-effective route when a surveyor is required. We prepare the Schedule of Condition and the Party Wall Award and guide everyone through.
1 Owner
£—
2 Owners
£—
3 Owners
£—
4 Owners
£—
Discounted rates: We offer reduced fees on Agreed Surveyor appointments subject to T&Cs — no more than 5 hours spent; invoice settled within 7 days of presentation; a Google review posted within 14 days of Award service.
Two surveyors work together to agree the Schedule of Condition and Award. As the Building Owner you pay both surveyors' fees — yours and your neighbour's.
1 Owner
£—
2 Owners
£—
3 Owners
£—
4 Owners
£—
Building Owner Surveyor fee shown. The adjoining owner's surveyor fee is separate and also paid by the Building Owner.
Option 1 must be chosen by the neighbour within 14 days of the Notice being served. If no response is received, a dispute is automatically deemed to exist — then only Options 2 or 3 are available. A reminder letter can be sent giving 10 additional days; if there's still no response, only Option 3 remains.
1(b): Schedule of Condition is prepared — no Party Wall Surveyor involved. Issues handled directly between the owners.
Option 2: A Party Wall Surveyor is involved to guide and mediate throughout the process.
How quickly works can start depends on which option your neighbour takes.
Option 1(a)
Works can start the next day. The process finishes when the neighbour provides consent.
Option 1(b)
Works can start once the Schedule of Condition report has been shared with both parties (2–3 days after the visit).
Option 2
Typically 2–3 weeks to complete the full process.
Option 3
Typically 3–5 weeks. Can take longer if the other side's owner or surveyor doesn't engage promptly.
When we're appointed as your (Building Owner) or Agreed Surveyor, here's what you get:
It's our firm's policy to make sure you're comfortable with the fee before we go any further. Once confirmed, these are the main stages:
Talking to your neighbours directly about party wall matters — before Notices land on the doormat — can reduce costs and speed up the whole process. Neighbours are often happy to agree to your chosen surveyor as the Agreed Surveyor, or to propose their own preferred surveyor for mutual agreement.
Free initial call. Tell us about your project and we'll confirm your fees and timeline.
Send An EnquiryInternal Tool
Type your client's name, copy the link, paste into your email.
Partner: —
The link loads the partner fee page and greets the client by name. The page is unlisted (not in Google, not in nav).
Bookmark This Page
Click Open to review a page, or Copy to paste the URL into an email.
Local Party Wall Surveyors
Free, friendly advice for building owners and adjoining owners.
We are based in Wimbledon and work across every London borough. Whether you are a building owner planning an extension, loft conversion or basement — or an adjoining owner protecting your property — we provide clear, practical advice at fixed, competitive fees.
Serving notices, drafting schedules of condition, and preparing party wall awards is what we do every day. Our local knowledge helps us move quickly so your project stays on track.
"Need answers? Chat with us — our advice is free and friendly."
Free, impartial advice from a Wimbledon-based party wall surveyor working across all 33 London boroughs.
Get Free Advice